Executed Projects
The executed projects are the result of the cooperative works between ALMUMAIZ Various Personnel (engineers, assistants, technical laborers ). The following tables for executed projects are categorized as follows;
1- Route Surveying.
2- Topographical surveying.
3- Hydrographical Surveying.
    In addition to that, the projects were selected in order to show the diversity of the surveying works carried out by ALMUMAIZ, That is to say that, the projects mentioned below represent a sample of the projects surveyed by ALMUMAIZ since its start in the year 2008.

Project Name
Description of services
Client
Location
Date
Elseleim - Halfa Road Sector B
Stake out of road alignment
Zadna For Roads & Bridges
Abosara - Abri North State - Sudan
Mar. 2008
Setting out and measurement of details with reference to the oil pipe line of 5 Km in length
Pioneer For Surveying And Engineering Consultants
Khartoum Refinery  - Khartoum State - Sudan
Apr. 2008
Aroma-Wagar Water Pipe Line
Study Surveying for water pipline from Atbara Nile to Aroma and Wager City (140 km )
Pioneer For Surveying And Engineering Consultants
Aroma - Wagar -Kassala State - Sudan
Apr. 2008
Detail Surveying and design for 11 km
Pioneer For Surveying & Consultants
Red Sea State - Sudan
May. 2008
Detail Surveying and design for 40 km
MAM for Roads & Bridges
Blue Nile State - Sudan
Dec. 2011 - Jan. 2012
6-Arab - Subag Husheib Road
Detail Surveying  for 143 km
PDA & SMEC
Algadaref State & Kasala State - Sudan
Jan. 2012 - Nov. 2012
1- Route Surveying:
Project Name
Description of services
Client
Location
Date
Topographical survey for 70,000 feddans with soil analysis
PECS Limited
River Nile State - Sudan
Feb. 2008 - March 2008
Madani Nuclear Medicine Hospital
Construction setting out for the 5th floor
Prova & Metash J.V.
Algazeera State - Sudan
March 2008 - may 2008
Digital Map For Nyala Town
Digitizing the maps and designing them according to the cartographical specifications of the National survey Authority
Free network Engineering Investment
South Darfour State - Sudan
April 2008.
Setting out the water station location
Biwater company
Khartoum State - Sudan
May 2008 - June 2008
Topographic map for 5,000 Feddans and Setting out of 109 Center pivots & canalization. With continuous surveying works required by the client.
DAL Agricultural Services Company Ltd.
Khartoum State - Sudan
Aug. 2008 - Till Now
Khartoum Refinery Map
Details Surveying for Establishing a Canal
EICO TEC.
Khartoum State - Sudan
Aug. 2008
2- Topographical Surveying :
Elseleit Main Canal
Details Surveying for Establishing a Canal
Khartoum Survey Company
Khartoum State - Sudan
Sep. 2008 - Oct. 2008
Stake out of plots. With continuous surveying works required by the client.
DC Investment Residential
Khartoum State - Sudan
Oct. 2008 -  Till Now
Establishing reference control point
Ram Energy.
South Kordofan State - Sudan
Oct. 2008
As-built drawings plan, profile & x-sections for exist canal (70km)
Mashkour Sugar Company
White Nile State - Sudan
May. 2009 -June 2009
Topographical survey for 750 feddans.
Noples Group - Noples Modern System
Khartoum State - Sudan
Aug. 2009 - Oct. 2009
Topographical survey for 11,000 feddans and main canals integrity check (plan, profile & x-sections)
DAL Agricultural Services Company Ltd.
White Nile State - Sudan
July 2010 -Aug. 2010
Topographical survey for 160,000 feddans, establishing & observation for 40 control points
Kenana Sugar Company Ltd. (KSC), with consultant Kenana Engineering & Technical Services (KETS)
White Nile State - Sudan
July 2011 - Dec. 2011
Topographical survey for 20,000 hectares, establishing & observation for 8 control points and Longitudinal profile for proposed main canal (21 km)
Kenana Sugar Company Ltd. (KSC), with consultant Kenana Engineering & Technical Services (KETS)
District of Gorgel - Mauritania
Dec. 2011 - Jan. 2012
Longitudinal profile for proposed  main canal (35 km) from river to project junction
Ministry of Agriculture
Khartoum State - Sudan
April 2012 - May 2012
Longitudinal profile for proposed main canal (17.4 km) with bathymetric survey in river
YAM Consultancy & Development Co. Ltd.
White Nile State - Sudan
June . 2012
Topographical survey for 5,000 feddans, establishing & observation for 8 control points and Setting out for 10,000 palm trees locations.
AL-HADDAD For Multi Activities Co. Ltd.
Khartoum State - Sudan
June. 2012 - Jan. 2013
3- Hydrographical Surveying :
Project Name
Description of services
Client
Location
Duration
Detailing Study with topographic survey for reservoir and longitudanal profile and x-sections for proposed dam axis and inlet channels
Rakaiz For Construction Development Buildings
South Kordofan State - Sudan
June 2008 - July 2008
Demarcation of dam axis and borrow areas and establishing control points,
Dam Implementation Unit (DIU)
Sinar State - Sudan
Aug. 2008 - Sep. 2008
Khor Shambat Surveying
Detail surveying and drawing
Abo Shora Co.
Khartoum State - Sudan
Oct. 2008
Collection of existing information, Distributing and fixing bench marks, surveying pertinent features, detail survey of the reservoir and spillway and inlet channels.
UNPOS with Main Contractor ATBARA Construction Company
North Darfur State - Sudan
April 2010 - June 2010
Details Surveying for determining bridge centre line profiling and facilitating the bridge design.
Yabi Markazi Co.
Khartoum State - Sudan
June 2010 - July 2010
Initial Study plan, profile and x-sections. With continuous surveying works required by the client
ICG Co.
Khartoum State - Sudan
Jan. 2011 - Till now
service to carry out a GPS survey to determine the profile (from inside river - bathymetry up to the suitable pumps station point); floor plan (position any nearby structure and civil work, canal head, pole and alignment); determine the profile of inlet and outlet canals and all related data for the 325 pumping points
IRRIGER TECHNOLOGIA E SERVI?OS DE IRRIGA??O LTDA,
River Nile State & White Nile State - Sudan
Feb. 2011 - Aug. 2011
Detailing Study with topographic survey for reservoir and longitudanal profile and x-sections for proposed dam axis and inlet channels
Dam Implementation Unit (DIU)
Red Sea State - Sudan
March - 2011
Topographical survey for 104,000 hectares, establishing & observation for 67 control points and Longitudinal profile for supply canal (11 km)
Alrawabi for Development Company LTD. (ADC) With Main Contractor Kenana Engineering & Technical Services (KETS)
River Nile State - Sudan
Nov. 2012 - April 2013